Power shutdown

174
Photo for representational purpose only.

JAMMU DECEMBER 14: To carry out work for installation and commissioning of 33 KV Indoor Circuit Breaker panel, the shutdown of 50 MVA, 132/33 KV Transformer banks installed at 132/33 KV Grid Station canal is being observed.

During the shutdown period of 50MVA Transformer Bank-2, rotational curtailment shall be enforced from December 15 to December 19 for one hour on 33/11KV Satwari, Toph and Company Bagh Receiving Station if required.

Similarly, during the shutdown period of 50MVA Transformer Bank-1, rotational curtailment shall be enforced from December 20 to December 24 for one hour on 33/11KV Manda, Medical and New Secretariat Receiving Station if required.

Meanwhile, for replacement of 33KV Bus-Bar and jumpering work at Sub-Station Ratnuchak, the shutdown of Ratnuchak-Sainik Colony line emanating from Grid Station BB-II is being observed.

During the shutdown, the power supply to Ratnuchak, Sainik Colony and its adjoining areas will remain affected on December 15 from 10 am to 2 pm.

However, to execute work for shifting of load, the shutdown of 33KV Switchyard at 132/33KV Grid Station Canal is also being observed.

During the shutdown, the power supply to Canal, Bhagwati Nagar, Chatha, Satwari, Talab Tillo, Medical, Company Bagh, Toph, parts of Rehari and Bohri will remain affected on December 15 from 10 am to 12 noon.